Long Lake Hydroelectric Project:
Transmission Line ROW Clearing

Owner: Regional Power

Project Description:
We  provided Right of Way clearing for the Long Lake Hydroelectric Transmission line project. We were responsible for the clearing of 25 hectares of forest, grubbing for 16 foundation sites, and the construction of 26 engineered helipads

The project was two weeks in duration, and took place in challenging and steep terrain, along an active power line. 
​
  • Right of way clearing
  • Grubbing
  • Trail Brushing